Mayor’s Letter to the Residents June 11, 2018

June 11, 2018

LIRR Update

Dear Neighbors,

                Although there are few outward signs, the Third Track Project is in full swing and in high gear.  The “early work” is being done that includes engineering designs, land surveys, soil samplings, etc.  Representatives from the design-build firm, Third Track Constructors or 3TC, will be conducting inspections of specific homes that are located close to the tracks to establish the existing condition of the foundations.  This is so any claims homeowners may make for damage due to vibration from the construction can be referenced against the pre-construction condition.

X